US-50 · CA

US-50 over Echo Summit: road conditions right now

Placerville, CA to South Lake Tahoe, CA

US-50 climbs the American River canyon from Placerville to Echo Summit, then drops down a cliffside grade into the Tahoe Basin and South Lake Tahoe. Caltrans puts the highway at about 7,200 feet near the summit, and its chain controls (R-1, R-2, R-3) apply on this stretch in storms.

Plan this drive for your departure time

Conditions at Tue, 10:10 PM PST

Highest risk along US-50: 2 of 5 (low), departing at that time.

  • No active NWS alerts on this route.

The road authority linked below has the final word on closures and chain requirements.

Later this week

  • Tomorrow (Wed, 7:00 AM PST departure): 2 of 5 risk (low). Fog or haze reducing visibility at Placerville around 7:00 AM. Plan this drive
  • Saturday (Sat, 7:00 AM PST departure): 3 of 5 risk (moderate). NWS Winter Storm Watch in effect until Sat 10:00 AM at South Lake Tahoe around 8:00 AM. NWS Winter Storm Watch in effect at drive time. Plan this drive

Departing 7 AM local time, from the National Weather Service hourly forecast at each checkpoint. Road reports are as of now.

Right now: LOW riskdeparting Tue, 11:00 PM PST from Placerville, CA

Clear driving for the whole 1 h 5 min.

Conditions: Clear

Plan this drive with your own departure timeChecked Tue, 10:10 PM PST. Updates hourly.

Checkpoints along US-50

WhereYou passWeatherRiskWhy
Placerville, CATue 11:00 PM 56°Fpavement 35°FlowNothing flagged
Pollock Pines, CATue 11:30 PM 43°Fpavement 34°FlowNothing flagged
South Lake Tahoe, CAWed 12:00 AM – 12:05 AM 36°Fpavement 32°FlowPavement 32°F, dry — below freezing but dry or treated (CADOT station CD029, 13.9 km away)

Why this stretch is hard in winter

  • Near the summit the road is squeezed between a rock cut on one side and a steep drop toward the Tahoe Basin on the other, so a single crash or slide can close both directions.
  • Rock slides close it too: in March 2022 a boulder closed US-50 at Echo Summit in both directions, and Caltrans sent drivers to I-80 instead.
  • During chain controls, Caltrans has cut the speed limit on US-50 to 25 mph.
  • R-2 means chains or traction devices on everything except 4WD/AWD with snow-tread tires on all four wheels; R-3 means chains on all vehicles, no exceptions.

What this page checks

  • Hourly forecast at every checkpoint for the time you would be there: temperature, precipitation type and rate, gusts, visibility.
  • Active National Weather Service watches, warnings, and advisories on the route.
  • Snow on the ground (NOAA SNODAS) and the Weather Prediction Center winter impact outlook.
  • Pavement temperature and surface state from state DOT road sensors, when you are leaving within a few hours.
  • Chain controls, closures, and winter road condition reports from state DOT feeds where they are published openly.
  • Seasonal closures of mountain roads the router might otherwise use.

Official sources for this corridor

Questions drivers ask about US-50

Echo Summit or Donner Pass to Tahoe in snow?
It depends on the storm and where you are going. Both are under Caltrans chain controls in storms. US-50 is a two-lane mountain highway near the summit, and I-80 is a divided interstate. Compare both on WeatherWeGo for the hour you would cross, and check Caltrans QuickMap.
What do R-1, R-2 and R-3 mean on US-50?
R-1: chains on all vehicles except passenger cars and light trucks with snow tires on at least two drive wheels. R-2: chains or traction devices on all vehicles except 4WD/AWD with snow-tread tires on all four wheels. R-3: chains on all vehicles, no exceptions.

Conditions change by the hour. This page is a planning aid built on public forecasts and DOT feeds; the road authority linked above has the final word on closures and chain requirements.

Nearby corridors: I-80 over Donner Pass · I-5 over Siskiyou Pass · CA-58 over Tehachapi Pass · I-5 over the Grapevine (Tejon Pass) · I-15 over Cajon Pass · CA-330 and CA-18 from San Bernardino to Big Bear Lake · all corridors